DYWIDAG Prestressing Systems using Bars - Installation

DYWIDAG Prestressing Systems using Bars

Installation

 

DYWIDAG-SYSTEMS INTERNATIONAL offers a full line of special installation accessories to facilitate field assembly and installation. Installation shall be carried out by properly trained and experienced personnel. If desired, tendons can also be delivered to the jobsite prefabricated (e.g. unbonded bar tendons).

In the anchorage area, adequate space is created through a pocket former assembled at the formwork before concreting in order to put on the jack and for the grout cap.

Stressing End

DYWIDAG Prestressing Systems using Bars - Installation
  1. Valve
  2. Formwork
  3. Pocket Former
  4. Grout Tube
  5. Retaining Nut
  6. Hex Nut
  7. Domed Anchor Nut
  8. Anchor Plate
  9. Duct
  10. Duct Sleeve A
  11. Duct