GEWI® Pile System
GEWI® Pile System - Double Corrosion Protection (DCP)

GEWI® Pile System

Double Corrosion Protection (DCP)

Fields of Application

  • Uplift control
  • Foundation
  • Baseplates
  • Reinforcement
  • Underpinnings

Legend

1 - Pile Head
2 - GEWI® or GEWI® Plus Threadbar
3 - Factory Grouted Corrugated Sheathing
4 - Spacer
5 - Permanently Protected Coupler Connection
6 - Cement Stone Coverage

Key Features

  • Double Corrosion Protection (DCP) achieved by grouted corrugated sheathing with controlled crack width
  • Permanent use (more than 100 years) – independent of corrosiveness and direction of load
  • Can be fitted with DYWIDAG post-injection system
  • Slender system – small borehole
  • A variety of pile head variations can be supplied depending on applications
  • Approved GEWI® System components